Construction of our production facility in Shenzhen is underway, with SMT and test lines commissioning in 2027. Until the lines come online, every order is built on five audited partner factories — to our specs, supervised by our QC team, re-inspected in our own lab before it ships.
Site works started in late 2026. SMT, assembly and test lines are scheduled to commission through 2027, with volume production in the same year.
Pick-and-place with AOI, ESD assembly cells, 48-hour burn-in racks and our RF test lab move in-house — the same equipment we run today on partner floors.
Nothing before 2027 and more after: the same QC gates, the same team, and a supply chain where production and inspection finally share one roof.
Pick-and-place lines with 0201 capability, reflow with nitrogen, in-line AOI and X-ray on BGA and QFN parts.
ESD-controlled benches, torque-controlled drivers, staked connectors and conformal coating on request.
48-hour thermal cycling racks, 0–45 °C, with logged current draw per unit.
Spectrum analyser, power meters and shielded enclosure for every VTX and amplifier batch.
Calibrated instruments, batch records kept five years, test reports issued per shipment.
Anti-static trays, retail cartons, HS coding, lithium-free declarations and photo reports before dispatch.
| Gate | Check | Sample |
|---|---|---|
| IQC | Incoming components, date code, X-ray on reels | AQL 0.65 |
| IPQC | First-article, solder joint AOI, ICT | 100 % |
| FCT | Function test per board on dedicated fixture | 100 % |
| Burn-in | 48 h thermal cycling, current log | On request |
| OQC | Final visual, packing, carton drop | AQL 1.0 |
Send the part numbers or the spec you are matching, plus quantity and destination. We come back within 24 hours.